Difference between revisions of "Build Master"

From Playasophy
Jump to: navigation, search
(Created page with "The person in this role is responsible for coordinating the setup and teardown of the camp infrastructure on-site. This role requires work at the beginning and end of the even...")
 
 
Line 1: Line 1:
 +
{{Hat}}
 +
 
The person in this role is responsible for coordinating the setup and teardown of the camp infrastructure on-site. This role requires work at the beginning and end of the event. The Setup Foreman must be present for both early arrival and teardown.
 
The person in this role is responsible for coordinating the setup and teardown of the camp infrastructure on-site. This role requires work at the beginning and end of the event. The Setup Foreman must be present for both early arrival and teardown.
  

Latest revision as of 00:16, 17 October 2016

The person in this role is responsible for coordinating the setup and teardown of the camp infrastructure on-site. This role requires work at the beginning and end of the event. The Setup Foreman must be present for both early arrival and teardown.

Responsibilities

  1. Familiarize yourself with the major pieces of the camp’s infrastructure and how to assemble them.
  2. Coordinate with the Layout Planner and determine a priority ordering for setup and teardown.
  3. Coordinate with the Dusty Trucker and Seattle Driver to determine packing and unpacking orders.
  4. Organize teams on-site to follow the setup and teardown plans.

Instructions

Links

...